China link to full world

𝗗𝗲𝗮𝗿 𝗿𝗲𝘀𝗽𝗲𝗰𝘁𝗲𝗱 𝘀𝗶𝗿 𝗜 𝗱𝗼 𝗴𝗼𝘁 𝗮𝗻 phone 𝗳𝗿𝗼𝗺 𝗰𝗵𝗶𝗻𝗮 𝘀𝗽𝗮𝗰𝗲𝘀𝘁𝗮𝘁𝗶𝗼𝗻 𝗮𝗻𝗱 𝗲𝗺𝗮𝗶𝗹 𝗮𝗹𝘀𝗼

𝟬𝟱𝟭𝟴𝟰𝟵𝟲𝟭𝟮𝟯 𝘀𝗽𝗮𝗰𝗲𝘁𝗿𝗮𝗶𝗻 𝗽𝗵𝗼𝗻𝗲 𝗻𝘂𝗺𝗯𝗲𝗿

Email: Ico@nssc.ac.cn
Tel: +86-10-62586404

This is the appropriate contact because your request is for international technical cooperation and feasibility assessment. Send your SpaceTrain proposal here first.

2. Do NOT use these for the first SpaceTrain proposal

hr@nssc.ac.cn — Overseas Recruitment → for employment/recruitment, not your project.

meridian@nssc.ac.cn — Meridian Project Center → specific scientific program, not the general project-contact route.

g.francesca@issibj.ac.cn — International Space Science Institute-Beijing → scientific institute; less appropriate for requesting development of a transportation system.

What to put in your email

To: Ico@nssc.ac.cn
Subject: International Cooperation Proposal — Human-Rated SpaceTrain Concept for 2032

Attach your proposal as a PDF, and ask NSSC to either evaluate the concept or forward you to the appropriate Chinese aerospace/engineering organization if NSSC is not the correct institution.

One correction: NSSC is primarily a space-science research organization, so it may not manufacture your SpaceTrain. Your request should therefore be for technical assessment and referral to the appropriate engineering organization, rather than asking NSSC directly to build it.

email to spacestation china

If you want, I can turn your proposal into a *professional email specifically addressed to Ico@nssc.ac.cn*, ready for you to send.
[10:24 AM, 8/25/2026] Saharakart: Ico@nssc.ac.cn
[10:29 AM, 8/25/2026] Saharakart: https://www.cnsa.gov.cn/english/n6465684/n6465689/index.html

-->>>0518496123 spacetrain phone 𝗻𝘂𝗺𝗯𝗲𝗿
𝗘𝗺𝗮𝗶𝗹
Absolutely. Since you are starting from zero earnings, I would build the plan in stages rather than setting an unrealistic requirement that you personally finance the entire SpaceTrain.

🚄 Your 2026–2045 SpaceTrain Roadmap
The main goal
Earn → build businesses → save/invest → develop SpaceTrain technology → attract engineers/investors → build prototype → demonstrate → commercial project

Your personal money should eventually become seed capital, not the entire cost of a national/international transportation system.

Phase 1 — 2026–2027: Get to your first income
Target: SAR 0 → SAR 10,000/month income

Your priority should be generating reliable income from activities you already understand.

Possible sources:

SaharaKart / e-commerce

Shopify

Product sourcing and trading

Catalyst/chemical business

Online Chemistry/Physics teaching

Website development

Digital services

B2B sales/commission business

Financial target
Period Target
End 2026 First consistent income
2027 SAR 5,000–10,000/month
Savings target SAR 30,000–50,000
Don't worry if you don't reach these numbers immediately. The first objective is proving that you can generate money consistently.

Phase 2 — 2028–2030: Build serious capital
Target income
SAR 10,000 → 30,000/month

By this stage, I would want you to have one main business that produces predictable cash flow, rather than trying ten businesses simultaneously.

Your financial objective could be:

SAR 100,000–300,000 accumulated capital by 2030
At the same time, start developing your SpaceTrain project professionally.

Create:

SpaceTrain concept

Technical requirements

Engineering drawings

Computer simulations

Business model

Preliminary route concepts

Safety concept

Energy requirements

Propulsion concept

Magnetic levitation concept

Tube/vacuum system concept

Cost estimates

Investor presentation

Patent/IP strategy

Phase 3 — 2030–2035: Turn the idea into a technology project
This is where your project becomes much more serious.

Financial target
I'd aim for SAR 500,000–1 million of your own/business capital by around 2035, if your businesses grow successfully.

But do not assume you need SAR 1 billion personally.

Instead:

Your capital → prototype

Prototype → credibility

Credibility → investors

Investors + government + industrial partners → large-scale project

You could potentially approach organizations such as:

aerospace companies

railway companies

universities

engineering firms

sovereign/institutional investors

technology investors

government transportation organizations

And eventually CASC or other international aerospace/transport organizations where technically appropriate.

Phase 4 — 2035–2040: Prototype
This is where I would target your first serious physical SpaceTrain prototype.

For example:

Stage A
Small laboratory demonstrator

↓

Stage B
Small pod + guideway

↓

Stage C
Low-pressure tube experiment

↓

Stage D
Propulsion and magnetic-control testing

↓

Stage E
Integrated prototype

↓

Stage F
Longer test track

You don't start by building a 500-km passenger system.

You start with something that can demonstrate:

"This technology actually works."

That demonstration is extremely valuable when approaching investors.

Phase 5 — 2040–2045: Pilot SpaceTrain
This becomes your ambitious long-term target.

Target:
First meaningful pilot transportation system around 2040–2045

I would phrase it as a target, not a guaranteed completion date.

The actual date will depend on:

technology

safety certification

funding

government approval

engineering

land/infrastructure

energy requirements

materials

testing

economics

💰 Your financial ladder
Here's the ladder I would personally use for your situation:

Target Meaning
SAR 10,000 First financial milestone
SAR 50,000 Emergency/business reserve
SAR 100,000 First serious business capital
SAR 500,000 Strong foundation
SAR 1 million Serious personal/business seed capital
SAR 5 million Potentially enough for substantial R&D activity
SAR 10 million+ Major prototype/investment capacity
SAR 100m+ Institutional-scale project territory
SAR 1bn+ Potential large infrastructure territory
These are planning milestones, not estimates of the actual cost of SpaceTrain.

The important thing is that you shouldn't think:

"I need billions, so I can't do it."

Instead:

"I need enough money to build the next stage, and that stage needs to attract the money for the following stage."

⭐ Your most important goal right now
You told me:

"I have no earning until now."

So forget SAR 1 billion for the moment.

Your immediate target should be:

ZERO → SAR 1,000/month
Then:

1,000 → 5,000

Then:

5,000 → 10,000

Then:

10,000 → 30,000

Then:

30,000 → 100,000+

Your SpaceTrain dream should grow alongside your financial capability.

🚄 And I would change your CASC proposal
Instead of saying:

"I want to build SpaceTrain by 2030."

I recommend:

"I am developing a long-term SpaceTrain transportation concept. I intend to conduct initial feasibility and technology-development activities during 2030–2032, with a long-term objective of developing a pilot demonstration system around 2040–2045, subject to technical feasibility, funding, regulatory approval and international cooperation."

That is much more credible.

Your overall roadmap
2026: 💰 Start earning
↓
2027: 📈 Build income
↓
2028–2030: 💵 Build capital + SpaceTrain feasibility
↓
2030–2035: 🔬 R&D + prototype
↓
2035–2040: 🚄 Larger test system
↓
2040–2045: 🌍 Pilot SpaceTrain
↓
2045+: 🚄 Commercial expansion

Your first mission isn't to build the SpaceTrain. Your first mission is to build the financial and technical foundation that makes SpaceTrain possible.

If you want, I can next make you a detailed 2026–2030 earning plan for SaharaKart + catalyst trading + teaching, with a monthly income target and exactly how much you should save toward the SpaceTrain fund.